Renewable energy company Greenko has commissioned a 50-MW wind farm at Basvanbagewadi farm in Karnataka, and has begun supplying power through the grid. This is part of the phase-II expansion at the Basvanbagewadi wind farm, which includes 51.2 MW in phase-I. Along with Mangalore wind farm of 15 MW and Matrix farm of 15 MW, which have already been commissioned, this farm now has a total capacity of 131.2 MW. Anil Chalamalasetty, CEO, said: “The company strategy of building large farms in a phased manner connected to high voltage transmission systems enables Greenko to deliver predictable and profitable growth. We expect to reach about 700 MW operating capacity to capture the season.”
Greenko commissions wind farm
Published on
June 4, 2014 16:28
Tags