Gujarat Gas Company Ltd has received authorisation for its Hazira-Ankleshwar natural gas pipeline from the Petroleum and Natural Gas Regulatory Board.
The provisional system capacity and extra capacity for this pipeline shall be equal to 5.06 mmscmd and 1.265 mmscmd, respectively, the company said in a filing with the stock exchanges.