Larsen and Toubro (L&T) has bagged two (engineering, procurement and construction) EPC orders worth $480 million for two dual fuel - fired gas-based power plants in Bangladesh, the company said in a filing to the stock exchanges.
The L&T stock was trading at Rs 1,594, up 1.83 per cent or Rs 28. The stock has gained about Rs 500 in the past three months.