Dilip Buildcon is lowest bidder for rail project in Himachal Pradesh

Our Bureau Updated - November 30, 2021 at 03:54 PM.

The Rs 637-cr project includes slope protection works on the new Bhanupali-Bilaspur-Beri line

BSE-listed Dilip Buildcon Ltd has been declared the lowest bidder for a tender floated by Rail Vikas Nigam in Himachal Pradesh, according to a stock exchange filing.

The work includes slope protection and allied works in connection with the Bhanupali-Bilaspur-Beri new railway line in Bilaspur district. The project cost is Rs 636.94 crore and it has to be completed in 24 months.

Published on November 30, 2021 10:24