Om Metals Infraprojects , in joint venture with Patel Engineering, has bagged a contract worth about ₹92 crore (company’s share) on upstream power house pertaining to Phase 1 of the Kundah Pump Storage Hydro Electric project (1x125 MW) in Nilgiri District from TANGEDCO.
The scope of the project includes design, engineering, supply, transport, execution and commissioning of all components of hydro mechanical works and steel liner for pressure shaft and penstocks. Shares of Om Metals slipped 2.4 per cent at ₹42.70 on the NSE.