‘The way supply chains are run, one has to forecast future demand in a large span of time. While people have built their careers on forecasting, the problem is that forecasts are never accurate.
Relatively accurate forecasts are possible in smaller horizons. The quest should be to see how one can bring down the lead time from four to two months. One needs to attack all the components of lead time so that the accuracy of forecasts does not matter.
According to TOC, the ‘elevation' will happen when the positive rub-off on on-time availability of spares adds to TACSA's sales numbers. In the case of spares, the target is to increase sales by 50 per cent. We're getting there.'
— Puneet Kulraj, Vector Consulting